Detailed Installation Steps for Fixed Belt Conveyors
News 2025-07-30
Step-by-Step Installation Guide for TD75 Universal Belt Conveyor
(Compiled by Jinrui Tech Team – Clear & Practical Version)
Detailed Installation Steps & Operating Procedures:
Mark Centerline & Position
Locate the central axis on the ground and confirm the equipment placement.
Assemble Frame Structure
Connect the tail frame with intermediate frames.
Secure leg angle irons and bolt the support legs of intermediate sections.
Fix Intermediate Frames
Use connecting plates to join and stabilize intermediate frames.
Anchor to Foundation
Drill holes in the base according to the leg baseplate holes, then secure with expansion bolts.
Install Lower Idlers
Mount bottom (return) idlers in advance.
Lay Conveyor Belt
Spread the belt flat over the lower idlers.
Mount Drive & Tail Pulleys
Install the motorized drum on the head frame and the tail pulley on the tail frame.
Upper Idlers & Belt Tensioning
Install troughing idlers and adjust the screw take-up device to align/tension the belt.
Attach Cleaning Components
Install the head scraper, secondary (empty-section) cleaner, and hold-down wheels; ensure proper contact.
Check Fasteners
Inspect all bolts and mechanical fasteners for tightness.
Test Run
Conduct no-load operation trials. Only proceed to formal use after successful testing.


